MAINTENANCE
To Lock Mercury Within the Reservoir: Tilt the entire unit back
45° towards the reservoir to permit mercury to flow out of
cartridge tube and into reservoir. When cartridge tube is
completely emptied of ALL mercury (and while it is still tilted
45°), move locking lever to the right "OFF". Mercury should be
locked within the reservoir during maintenance or transport. To
release mercury, move lever to "ON" position. If necessary, tilt
unit towards tube to allow mercury to flow out of reservoir.
Lift up the spring loaded EZ-Tube
™
mechanism
located at the top of the instrument. Tilt
instrument forward to free tube. If necessary
use a small flat head screw driver to help
dislodge the top of the tube. To replace tube,
lift EZ-Tube
™
mechanism and inset base of
tube into main unit, being sure graduation
marks face out. Next position top of tube and
release EZ-Tube
™
mechanism.
To Register Your Product, visit us at
w w w. a d c t o d a y. c o m
and follow the links
55 Commerce Drive
Hauppauge, NY 11788
Customer Service: 1-800-ADC-2670
Voice: 1-516-273-9600
Fax: 1-516-273-9659
email: info@adctoday.com
http://www.adctoday.com
NEW YORK • LONDON • TAIPEI • TOKYO
2002 ADC
Part# 9356A-00
DIAGNOSTIX
™
932
• SCHEMATIC
• PARTS LIST