Stainless Steel Enclosure (Ti-S750S/S750S-8); Connecting The Weigh Platform; Ti-S750S/S750S-8 Main Circuit Board Overview; Connection Assignments For The Load Cell Terminal (J9) - Salter Brecknell S750 Series Operation/Setup Manual

Table of Contents

Advertisement

2.2

STAINLESS STEEL ENCLOSURE (TI-S750S/S750S-8)

For indicators contained in a stainless steel enclosure, the rear cover must first be removed to
make the appropriate connections to the weigh platform, printer, remote display and power supply.
To remove the rear cover, simply remove the screws that secure it to the enclosure and set aside.
NOTE: The rear cover must remain off to access the Setup Menu and calibration procedures.
S-
E-
Figure 2-5: TI-S750S/S750S-8 Main Circuit Board Overview

2.2.1 CONNECTING THE WEIGH PLATFORM

1. Connect your shielded load cell cable (not included) to terminal J9 on the main board.
Connection assignments for the Load Cell Terminal (J9) are shown in Figure 2-6.
Figure 2-6: Connection assignments for the Load Cell Terminal (J9)
PIGGYBACK ADC BOARD ASSY
J9
J6
J5
J10
J7
S+
E+
P+ P-
TXD RXD GND
TX2 GND
CL+ CL–
J9
S–
Page C-1
E– S+
E+
JP2
EPROM

Advertisement

Table of Contents
loading

This manual is also suitable for:

S750S750-8Ti-s750sTi-s750s-8

Table of Contents