Service Schedule of Components
This maintenance chart shows you the standard of replacement and cleaning time for each part.
Because those may replace depending on environment and purpose for use, use the chart for reference.
Ref. No.
B2
Cylinder Assembly
B3
Loading Motor Assembly
B8
Pulley Assembly
B587
Tension Lever Assembly
B31
ACE Head Assembly
B573, B574
Reel S, Reel T
B37
Capstan Motor
B52
Cap Belt
B73
FE Head
B86
F Brake Assembly (HI)
B133
Idler Assembly (HI)
B410
Pinch Arm Assembly
B414
M Brake (SP) Assembly (HI)
B416
M Brake (TU) Assembly (HI)
B525
LDG Belt
Notes:
1. Clean all parts for the tape transport (Upper Drum with Video Head / Pinch Roller / ACE Head / FE Head) using
90% lsopropyl Alcohol.
2. After cleaning the parts, do all DECK ADJUSTMENTS.
3. For the reference numbers listed above, refer to Deck Exploded Views.
STANDARD MAINTENANCE
Deck
Part Name
H: Hours
Periodic Service Schedule
1,000 H
2,000 H
2-1-1
: Cleaning
: Replace
3,000 H
4,000 H
H9740MEN
Need help?
Do you have a question about the DV-NC100S and is the answer not in the manual?
Questions and answers