Vent Termination Clearances - United States Stove 5660E Manual

Table of Contents

Advertisement

VENT TERMINATION CLEARANCES

A. Minimum 4-foot (1.22m) clearance below or
beside any door or window that opens.
B. Minimum 1-foot (0.3m) clearance above any
door or window that opens.
C. Minimum 3-foot (0.91m) clearance from any
adjacent building.
D. Minimum 7-foot (2.13m) clearance from any
grade when adjacent to public walkways.
E. Minimum 2-foot (0.61m) clearance above any
grass, plants, or other combustible materials.
F. Minimum 3-foot (0.91m) clearance from an
forced air intake of any appliance.
G. Minimum 2-foot (0.61m) clearance below eves
or overhang.
H. Minimum 1-foot (0.3m) clearance horizontally
from combustible wall.
I.
Must be a minimum of 3 foot (0.091m) above
the roof and 2 foot (0.61m) above the highest
point or the roof within 10 feet (3.05m).
Step 1
Pull the factory installed wires out
of the top of the stove. There will
be two wire harnesses, as shown.
Assembly Instructions
Step 2
Unpack the top mount controls and
ensure that the wiring harness shown
is attached securely.
Attach the control panel to the top of the stove, as shown.
Secure with two sheet metal screws.
-6-
G
Connect the factory installed
wiring harnesses to the control
Step 4
Step 5
Step 3
panel as shown.

Advertisement

Table of Contents
loading

Table of Contents