Download Print this page

OLT GardenSaver GS84-D Assembly Manual page 8

Garden shed with double door

Advertisement

3.
With Floor Joist Frames positioned
together flush, attach with 6 - 2 1/2"
screws.
45 1/2"
96"
5.
With Floor Runners attached, carefully flip the floor over and place on your foundation.
Caution - you may need 2 people to assist you. Be careful when laying floor down not to bend or twist
floor. Note: The floor will be flipped over and floor runners will sit on your foundation. It is important
to note that having a level foundation is critical. Choosing a foundation will vary between regions.
Typical foundations can be concrete pads or patio stones positioned underneath the floor runners.
6.
When in place, level floor completely
before proceeding.
Toll Free 1-888-658-1658
4th Runner
4.
Position and attach Floor Runners
(1 1/2" x 3 1/2" x 45 1/2") to completed floor
frames with 6 - 2 1/2" screws per Runner.
Make sure Runners are flush with outside
of floor framing but not overhanging. Make
sure 4th Runner is placed equally over seam
where floor frames meet.
4th Runner
7.
Position Plywood Floor pieces (2) on top of
completed floor joists.
www.outdoorlivingtoday.com
Page 8
Flush with Floor Framing.
sales@outdoorlivingtoday.com

Advertisement

loading