Download Print this page

OLT GardenSaver GS84-D Assembly Manual page 20

Garden shed with double door

Advertisement

35.
With Rafter Section correctly aligned, secure rafters to walls using 90° Metal Brackets. Start with
outside rafters and secure 2 Brackets with 1 1/4" screws. Screw into Wall Extension Framing at the
front, and Wall Panel top framing at the rear. Complete both sides.
Front
36.
With outside rafters properly secured, completely secure remaining interior rafters using
6 - 2 1/2" Screws. Screw into rafters from inside of Extension Wall framing at front of shed and inside
Rear Wall framing at rear of shed, behind Horizontal Wall Cleats.
37.
Carefully flip Roof Panels over so plywood sheathing is facing up.
Center Rafter/Facia Nailing Plates (2) (3/4" x 3/4" x 51") onto outside of each
panel flush with plywood. Attach with 4 - 1 1/4" screws evenly spaced. The
Rafter/Facia Nailing Plate provides for a greater nailing surface later when you
attach side facia.
Toll Free 1-888-658-1658
Rafter/Facia Nailing Plate.
www.outdoorlivingtoday.com
Page 20
90° Metal Brackets
sales@outdoorlivingtoday.com

Advertisement

loading