Download Print this page

OLT GardenSaver GS84-D Assembly Manual page 11

Garden shed with double door

Advertisement

13.
With the corner wall attachment complete, position the second rear wall panel in place so
bottom 2x3 wall framing is sitting flush with outside floor framing. Wall siding should overhang floor by
approximately 3/4". When positioned correctly, attach both wall panel studs together as per
Step 12 with 3 - 2 1/2" screws.
15.
Secure side wall panel to rear wall panel as per Step 12. Next, locate a Narrow Wall Panel and
position in front corner.
Toll Free 1-888-658-1658
Do Not Attach
Walls To Floor
until Step 30.
Pilot Hole
first.
www.outdoorlivingtoday.com
Page 11
sales@outdoorlivingtoday.com
Pilot Hole
first.

Advertisement

loading