Download Print this page

Freezing Protection - Zoeller CRAWL SPACE 108 Instructions Manual

Pumping system

Advertisement

STEP 5
5.1)
Plug in pump.
5.2)
Pour water through lid until pump comes on.
5.3)
Check all discharge line connections for leaks or obstructions.
5.4)
If the pump begins to "short cycle" as described in part "C" of the
troubleshooting guide, then it will be necessary to install a check
valve in the discharge line. This will prevent water from draining from
the discharge line back into the pit. Refer to Figure 5.1. If a check
valve is installed, the discharge pipe must be protected from freezing.
Refer to Step 6 for freezing protection.
5.5)
If after completing the above procedures the system is not operating
properly, refer to the Trouble Shooting Guide.
STEP 6
Note: If there is the possibility of the discharge line freezing, then install the discharge line as recommended in Figure 6.1.
Testing of System
(SUPPLIED BY OTHERS)

Freezing Protection

DISCHARGE
BACKFILL
GRAVEL
Figure 6.1
© Copyright 2012 Zoeller Co. All rights reserved.
6
FLEXIBLE HOSE
CHECK VALVE
BUSHING
Figure 5.1
GROUND
FROST LINE
PVC
LINE
PIPING
CLAMP
NOTE: FLOAT
AND SWITCH
NOT SHOWN
FOR CLARITY.
SK1805
SK1822

Advertisement

loading

This manual is also suitable for:

Crawl space 138Z1080001108-0001