Download Print this page

Zoeller CRAWL SPACE 108 Instructions Manual page 5

Pumping system

Advertisement

STEP 3
3.1)
Attach the flexible discharge hose to pump and lower into pit.
3.2)
Attach lid and complete discharge line connections.
Note: Attach the lid to the extension with O-ring (included).
DO NOT
USE LID SUPPLIED WITH
SLOTTED BASIN IF USING
EXTENSION KIT.
GROUND LEVEL
DRAIN LINES OR
WEEP TILES
PRIMARY PUMP
STEP 4
4.1)
Backfill pit as shown in Figure 4.1 & 4.2.
25' CORD
GROUND LEVEL
DRAIN LINES OR
WEEP TILES
PRIMARY PUMP
Figure 4.1
Installation of Pump and Cover
"SLOTTED" BASIN LID
1 1/4" ELECTRICAL
ACCESS HOLE.
2" FLEXIBLE
DISCHARGE LINE HOLE.
25' CORD
DISCHARGE LINE
Figure 3.1
DISCHARGE LINE
BACKFILL
GRAVEL
"SLOTTED" BASIN
© Copyright 2009 Zoeller Co. All rights reserved.
© Copyright 2012 Zoeller Co. All rights reserved.
DISCHARGE LINE HOLE.
1 1/4" ELECTRICAL
ACCESS HOLE.
EXTENSION
GROUND LEVEL
O-RING
"SLOTTED" BASIN
"SLOTTED" BASIN
Backfill Pit
EXTENSION
GROUND LEVEL
DRAIN LINES OR
WEEP TILES
"SLOTTED" BASIN
PRIMARY PUMP
5
EXTENSION KIT LID
2" FLEXIBLE
1/2" DIA. INLET DRAIN HOLE
25' CORD
DISCHARGE LINE
PRIMARY PUMP
Figure 3.2
25' CORD
DISCHARGE LINE
Figure 4.2
DRAIN LINES OR
WEEP TILES
EXTENSION
SK1799
BACKFILL
GRAVEL
SK1807

Advertisement

loading

This manual is also suitable for:

Crawl space 138Z1080001108-0001