Improper installation, adjustment,
!
alteration, service or maintenance can
cause injury or property damage.
All installations must conform to the requirements of the
authority having jurisdiction. Such applicable requirements
take precedence over the general instructions of this
manual.
Where required by the authority having jurisdiction, the
installation must conform to the American Society of
Mechanical Engineers Safety Code for Controls and Safety
Devices for Automatically Fired Boilers, ANSI/ASME No.
CSD-1.
Locate boiler in front of final position before removing crate.
Provide a level solid base as near chimney as possible and
centrally located with respect to the heat distribution system
as practical.
!
Boiler may not be installed on combustible
flooring.
Allow 24 inches in the front, top and right hand side for
servicing and cleaning, or removing tankless water heating
coil.
It is recommended that 24 inches be allowed in back of
boiler for convenience when skimming hole is used.
When installed in a utility room, the door should be wide
enough to allow the largest boiler part to enter, or to permit

INSTALLATION PROCEDURE

WARNING
WARNING
replacement of another appliance such as a water heater.
The boiler shall be installed such that the oil ignition system
components are protected from water (dripping, spraying,
rain etc.) during appliance operation and service.
FOR INSTALLATION ON NON-COMBUSTIBLE FLOORS
ONLY - The boiler must not be installed on carpeting
or vinyl flooring. Minimum clearances to combustible
construction are:
TOP
FRONT
FLUE CONNECTOR
REAR
LEFT SIDE
RIGHT SIDE
NOTE: Clearance for access should exceed fire protection
Figure #2
Minimum clearances to combustible
construction (as seen from above)
6"
4
24 IN.
24 IN.
9 IN.
24 IN.
6 IN.
24IN.
clearance.
24"
24"
BOILER
24"