Service Checklist - ECR DUNKIRK ESC3100 Installation, Operation & Maintenance Manual

Oil-fired cast iron boiler
Table of Contents

Advertisement

Periodic inspection and tightening of the tankless heater/cover
plate bolts will reduce the risk of leaks. See parts 3 and 5
under "Coil and Cover Plate Replacement Parts."
ELECtRONIC LOW WatER CUt-OFF
Operation of the probe and control should be checked, with
the burner on, by draining the water via the drain on the
bottom of the boiler. This will drain the water quickly from
the boiler and break the circuit to the burner. If it does not
inspect the probe for scaling. If scaling is present, clean off
the probe, refill the boiler until the ELWCO is satisfied, and
perform the check again.
Inspect Chimney and Flue Pipe
Inspect and Clean Appliance
Inspect Oil Line - Size/Leaks
Inspect Electrical Connections
Install New Filter
Room Make-up Air
Electrode Setting
Proper Light-Off (Hot & Cold)
* Measure with instruments and record results below.
Nozzle
Date
Size
Angle
MAINTENANCE PROCEDURES

SERVICE ChECkLIST

[ X ]
[ X ]
[ X ]
[ X ]
[ X ]
[ X ]
[ X ]
[ X ]
Service record
Pump Pressure
PSI
Type
!
Water will be boiling hot.
It is suggested that a qualified service agency be employed
to make an annual inspection of the boiler and heating
system. They are experienced in making the inspections
outlined above and, in the event repairs or corrections are
necessary, can make the proper changes for safe operation
of the boiler.
Controls and Safety Devices
Nozzle-Size, Angle, Type
Pump Pressure/Vacuum
Line Voltage/Motor Amps
Smoke Test
Draft-Overfire/In Flue
CO
or O
2
2
Flue Gas Temperature
Line
Motor
Smoke#
Amps
Voltage
17
WARNING
[ X ]
[ * ]
[ * ]
[ * ]
[ * ]
[ * ]
[ * ]
[ * ]
CO
Draft
2
O.F.
INF
or O
2
Flue
Temp °F

Advertisement

Table of Contents
loading

Table of Contents