Download Print this page

Advertisement

Quick Links

General Instructions
03LBRO1208-V7
12x8 Combi Summerhouse
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips
screwdriver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
LOCATION FOR YOUR GARDEN BUILDING
A minimum of 60cm should be left around the perimeter of your garden building to allow access for
maintenance, annual treatment and to allow air ow around the building.
Where possible you should avoid placing your garden building underneath large trees to prevent the tree
causing damage to the building.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions. For the duration of heavy
or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during
excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can
be helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm
sunshine and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to
prevent the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof
treatment to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base
dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding
should overlap the base, creating a run o for water. It is also recommended that the oor be at least 25mm
above the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or
using this product.
Please retain product label and instructions for future reference
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
**Protim Aquatan T5 (621)**
Your building has been dip treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
REGISTER FOR YOUR
ANTI-ROT
GUARANTEE TODAY
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
PLEASE SCAN HERE:
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 03LBRO1208-V7 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 03LBRO1208-V7

  • Page 1 For assistance please contact customer care on: 01636 821215 should overlap the base, creating a run o for water. It is also recommended that the oor be at least 25mm above the surrounding ground level to avoid ooding. Mercia Garden Products Limited, Sutton On Trent, TYPES OF BASE Newark, - Concrete 75mm laid on top of 75mm hard-core.
  • Page 2 03LBRO1208-V7 Please retain product label and instructions for future reference Overall Dimensions: Width =3796mm Depth = 2514 mm Height = 2146mm Base Dimensions: Width = 3688mm Depth = 2439mm Before assembly please make sure you have a suitable base ready to erect your...
  • Page 3 Please retain product label and instructions for future reference Fixing kit cont.. Nail Bag PI-02-1028 Step 2 PI-02-1008 70mm Screw x 13 2x Door Handles Place the 2 oor panels (No. 13) onto a rm PI-07-0001 and level base, ensuring the 50mm Screw x 97 base has suitable drainage and is free from areas where standing water can collect.
  • Page 4 Please retain product label and instructions for future reference Step 4 Step 6 Fix the side of the short panel (No. 4) Fix the side of one Back Panel (No. 5) against the framing of the back panel (No. 5) against the side of the other Back Panel with 3x50mm screws as shown in diagram.
  • Page 5 Please retain product label and instructions for future reference Step 10 Step 8 Place the Door Panel (No. 1) onto a at Fix the side of the Internal panel/Panel surface and x the Front Window Framing (No. 8/No. 32) against the frame of Panel (No.
  • Page 6 Please retain product label and instructions for future reference Step 12a Step 12c Attach the Plain Door (No.17b) to the door panel Fit the mortice lock (No. 40) into using 3x butt hinges (No.41) per door. the recess and x in place with the screws provided.
  • Page 7 Please retain product label and instructions for future reference Step 15 Step 13 Place the Storage Gable Sides Left/Right Fix the side of the Side Panel (No. 7) (No. 9/10) against the sides of the Internal against the framing of the back panel (No. 5) (No.
  • Page 8 Please retain product label and instructions for future reference Step 16b - Fitting Door Step 18 Secure the hinge (No. 41) to the Place the assembled Verandas (No. 15) ush to the storage door (No. 18) and the building as shown to make sure the building storage door panel (No.
  • Page 9 Please retain product label and instructions for future reference Step 19b Step 20a Fix the two Roof panels together using Once the Roof is aligned and secure the 50mm screws o set from each other as shown oor can be xed into postion. in the diagram.
  • Page 10 Please retain product label and instructions for future reference Step 20b Step 21 Continue to x the building into place by Place the Under Roof (No. 12) into position, screwing through the panel into the oor. making sure it is ush to the Door panel and Storage section.
  • Page 11 Please retain product label and instructions for future reference Step 22 Step 24 Cut the Felt (No. 34 ) into 3 sheets and lay Fix the Cover Trims (No. 23, 2x No. 24, onto the roof. No. 25, No.26, No.27 and 2x No. 28) into position as shown.
  • Page 12 Please retain product label and instructions for future reference Step 25 Step 27 To x the lock to the Shed Door, rst x the Door Attach two Turn Buttons (No. 43) to the Storage Blocks (No. 34 ) either side of the centre framing Door at the top and bottom of the door.
  • Page 14 REGISTER FOR YOUR PLEASE SCAN HERE: ANTI-ROT GUARANTEE TODAY...