Exmark ULTRAVAC 126-6122 Operator's Manual page 13

Hide thumbs Also See for ULTRAVAC 126-6122:
Table of Contents

Advertisement

Collection System Installation
Important: Verify that the bagger mount
support brackets are installed on your unit prior
to operation.
1.
Stop engine, remove key, and wait for all moving
parts to stop. Engage parking brake.
2.
Remove hairpin and chute pivot pin. Remove
discharge deflector. Pivot pin and hair pin may be
stored in the pivot holes of the discharge deflector
during bagging operation.
3.
Insert the hopper frame into the LH hopper
mount bracket. Rest the other end of the hopper
frame between the tabs on the RH hopper mount
bracket. Install the hairpin to secure the hopper
frame.
Note: If the hopper frame does not seat properly
in the mount brackets, carefully use the hopper
frame to slightly adjust the alignment of the
brackets. The frame is designed to initially fit tight
in the mounting brackets. It may be necessary to
use a mallet to install.
1. LH hopper mount bracket
2. Hopper frame
3. Hairpin
4. RH hopper mount bracket
5. Hold down rod
4.
Slide the hopper hinges onto the hopper frame
pins. Make sure the seal is positioned around the
brackets where the bags mount.
Figure 8
1. Hopper frame pin
2. Seal (partially removed
for clarity)
5.
Open the hopper and install the bags. Close the
hopper and stretch the rubber latch over the hold
down rod.
6.
Remove the belt cover on the right side of the
deck.
7.
Mount the blower on the deck by inserting the
mounting pin into the tube welded to the rear
corner of the deck. Use Figure 10 to determine
the pin location in the blower frame.
g190024
1. Mounting pin
2. Roll pin
3. 52 inch deck location
13
Operation
Figure 9
3. Hopper hinge
4. Air vent
Figure 10
4. 48 inch deck location
5. 60 inch deck location
g037999
g037990

Advertisement

Table of Contents
loading

This manual is also suitable for:

4503-654

Table of Contents