Leb Electronics STONE 230 Instructions Manual page 12

Underground gearmotor for wing gates
Table of Contents

Advertisement

Available languages

Available languages

Insert the metal ball in the box pivot. Put the traction arm on

the foundation box pivot (fig.10).
Join the chain connecting the traction arm to the gearmotor by

means of the supplied link (fig.11).
Adjust the screw of chain stretcher so that the chain is

sufficiently tense (fig.12).
Figure 10
Installation - Lever version 110°
Connect the mechanical closing stroke-end on the motor lever.

Insert the lever on the motor shaft and fix it by means the
special screw and bolt (fig.15).
Insert the metal ball in the foundation box pivot. Insert the

traction lever on the foundation box pivot. Connect the
transmission rod as shown in the figure 16. Fix the transmission
rod by means the special screws and washers.
Closing stroke-end
Figure 15
Motor lever
Figure 11
Transmission rod
11
ENGLISH
Figure 12
Figure 16
Traction lever

Advertisement

Table of Contents
loading

Related Products for Leb Electronics STONE 230

This manual is also suitable for:

Stone 24

Table of Contents