Leb Electronics STONE 230 Instructions Manual page 11

Underground gearmotor for wing gates
Table of Contents

Advertisement

Available languages

Available languages

ENGLISH
After positioning the foundation box, proceed with the assem-

bling of gearmotor:
Let to pass the motor's cable coming from the installation by

means the special cable gland Pg9, fitted on the motor's cover.
Connect the cable coming from the installation to the motor's

cable piece by means of clamps (fig.5).
Tighten the cable gland Pg9 and connect the motor's cover to

the gearbox by means of the screws.
Anchor the gearmotor to the screws of the foundation box with

the supplied bolts (fig.6).
Figure 5
Installation - Chain version 180°
Insert the screw of chain stretcher in the special bolt welded on

the foundation box (fig.7).
Connect the chain stretcher group to the box pivot (fig. 8).

Figure 7
10
Figure 6
Figure 8

Advertisement

Table of Contents
loading

Related Products for Leb Electronics STONE 230

This manual is also suitable for:

Stone 24

Table of Contents