Charging - Carrier Infinity SYSTXCCWIC01-B Installation Instructions Manual

Hide thumbs Also See for Infinity SYSTXCCWIC01-B:
Table of Contents

Advertisement

NOTE: See the outdoor equipment Installation Instructions for information on
what conditions CHARGING COOLING and HTG CHECK CHARGE are
available.
6.6.1.

Charging

Within the CHARGING COOLING or HTG CHECK screens, the installer will
have the ability to enter the LINESET length and the VAPOR LINE diameter.
After the selections are made, touch NEXT.
Lineset: Selectable from 5 to 200 feet
S
NOTE: For 18/19 VS product, 100 feet is the maximum allowed refrigerant
line length.
Vapor line: Selectable with various diameters by using the up and down
S
buttons
Next, the installer will enter the WEIGH IN screen to verify the current total charge
is accurate. Once the installer has confirmed, touch DONE.
Next, the installer will enter the SERVICE VALVE SUBCOOL screen. This screen
will show the current liquid line subcool target (in _F). To begin the charging, touch
START. If the outdoor temperatures are not in the required range, Service Valve
Subcool may not be available. For HTG CHECK CHARGE, the option Service
Valve Subcool is unavailable.
81
A14232

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents