RODUCT NFORMATION Dear customer Thank you for buying a high-quality aluminium greenhouse. EMARKS In all drawings you find the mounting-instructions for all basic standard-models. However this manual should be a sufficient guidance for all special-case greenhouses. This greenhouse is designed for cultivation of plants/flowers. Therefore leakage, water drops and condensation inside the building are allowed.
Page 3
" ROYAL - T" 829mm 2360mm = 1+2+3 = 4018 829mm 3098mm = 4+5 = 3927 829mm Note: Do not set concrete in the corners until the entire greenhouse frame is complete, level, and square. You may need some play to install the uprights.
Page 4
PALLET 1 ROYAL T ITEM ROOFWINDOW 4 pc WEIGHT: 342 kg BAG_SILICONE 1 pc DIMENSIONS: DOUBLE TURNING DOOR 1 pc 800 x 900 x 2200 mm SPANDREL 10 pc RIDGE DECORATION (box) 2 + 1 pc LOUVRE VENT 2 pc BAG_GLASS SPACERS (80 pcs) 2 pc ITEM...
Page 5
PALLET 2 ROYAL T ITEM PRO6578 corner profile 1630 mm 6 pc WEIGHT: 375 kg PRO40633 inner corner profile 1630 mm 2 pc DIMENSIONS: PRO6918 endbar roof 1830 mm 4 pc 800 x 900 x 2200 mm PRO1456 glazing bar 1830 mm 9 pc PRO1456 glazing bar...
Page 29
item L 40X40 4 pc 36 mm PRO6280 2 pc 1.441 mm PRO6280 2 pc 1.930 mm 8 pc Note: Your greenhouse kit may include more door frame pieces than are necessary for complete assembly. DDD 1...
Page 30
Door Frame Installation: Slide frame into place. Measure diagonally corner to corner. The measurement should be the same both ways. This ensures the door is square. Clamp in place. Next use a level on the vertical profiles. Ensure that the door frame is plumb.
Page 32
This screw is longer than most drill bits, making it impractical to drill the interior holes. Exaco recommends the following steps: 1) Use a long screwdriver (or other thin tool) to reach through each hole on the RED piece, then tap the handle gently with a hammer.
Page 39
Door Catch Install: Measure 15mm / 9/16 from the top of the door. Mark and pre-drill the screw holes. Install door catch. DDD 11...
Page 40
Insert a washer between black louvre frame and the greenhouse profile at all four bolt locations. If your model is equipped with the 'Louvre Vent Automatic Opener', you will need to remove the manual opener before installing. Please refer to the Installation and Care Manual (packaged alongside the opener) for further direction.
Page 42
Dakraam-Lucarne-Dachfenster-Roofwindow-Tagvindue Takluke-Takfönster-Finestra del tetto Note: Rubber seal is only installed on the sides of the roof window. GLAS Note: A 1-inch long bolt is inserted into the lower profile. This bolt is for the optional manual opener or the spindle opener.
Need help?
Do you have a question about the EOS ROYAL and is the answer not in the manual?
Questions and answers