Patterson-Kelley STORM ST-2500 Installation & Owner's Manual page 65

Gas fired boiler w/ nuro control system
Hide thumbs Also See for STORM ST-2500:
Table of Contents

Advertisement

5. Take a sample of the system fluid and verify the water quality complies with the standard
Appendix C – Water Quality Standards Quality Standards for Hydronic Boilers
defined in
in Multi-Metal
Systems.
6. Inspect and clean the condensate system and check for leaks. If a condensate neutralization kit
is present, open the lid and inspect the media. If they are absent or have been significantly
worn away, replace them with new media.
7. Examine the venting system. Refer to the vent manufacturer's instructions for requirements in
addition to those listed below.
INLET
OUTLET
DRAIN
VALVE
a. Check all joints and pipe connections for tightness.
b. Check pipe for corrosion or deterioration. If any piping needs replacing, do so
immediately.
c. Inspect and clean any screens in the vent terminal.
8. Qualified service personnel should thoroughly inspect the heating system and correct any
problems prior to re-starting the boiler.
9. Perform combustion analysis and readjust as necessary according to the Combustion Setup and
Adjustment combustion settings table.
Refer
to 3.11.2.
It is recommended that a copy of this report is filed for future reference.
10. Perform a leak test of the gas valve in accordance with the gas valve manufacturer's
instructions.
Revised: June 26, 2020
Released: June 26, 2020
© Patterson-Kelley 2020
All Rights Reserved.
TM
P-K Storm
Gas Fired Boiler
Technical Service 1.877.728.5351
2691000273 P-K Storm ST2500-ST4000
Installation and Owners Manual Rev A.docx
Page 56

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storm st-3000Storm st-3500Storm st-4000

Table of Contents