10.3

Outdoor Unit

10.3.1 Install the Outdoor Unit
After selecting the best location, start installation to Indoor/Outdoor Unit Installation Diagram.
1
Fix the unit on concrete or rigid frame firmly and horizontally by bolt nut (ø10mm).
2
When installing at roof, please consider strong wind and earthquake.
Please fasten the installation stand firmly with bolt or nails.
10.3.2 Connect the Piping
Connecting The Piping to Indoor
Please make flare after inserting flare nut (locate at joint
portion of tube assembly) onto the copper pipe. (In case
of using long piping)
Connect the piping
Align the center piping and sufficiently tighten the
flare nut with fingers.
Further tighten the flare nut with torque wrench in
specified torque as stated in the table.
Connecting The Piping to Outdoor
Decide piping length and then cut by using pipe cutter.
Remove burrs from cut edge.
Make flare after inserting the flare nut (locate at valve)
onto the copper pipe.
Align center of piping to valve and then tighten with
torque wrench to the specified torque as stated in the
table.
Model
A
ZC15***, ZC20***
570 mm
Do not over tighten, over tightening cause gas leakage.
Piping size
6.35 mm (1/4")
9.52 mm (3/8")
12.7 mm (1/2")
15.88 mm (5/8")
19.05 mm (3/4")
22
B
C
D
105 mm
18.5 mm
320 mm
CAUTION
Torque
[18 N•m (1.8 kgf.m)]
[42 N•m (4.3 kgf.m)]
[55 N•m (5.6 kgf.m)]
[65 N•m (6.6 kgf.m)]
[100 N•m (10.2 kgf.m)]