24. REGULATIONS AND STANDARDS

ČSN 06 0310 - Central Heating. Design and Assembly.
ČSN 06 0830 - Safety Devices for Central Heating and Service Water Heating
ČSN 06 1008 - Fire Safety of Local Appliances and Heat Sources (Water Heaters up to 50 kW)
ČSN 06 1610 - Flue Parts of Home Appliances
ČSN 07 0245 - How Water and Low Pressure Steam Boilers. Water Heaters up to 50 kW.
Technical requirements:
ČSN 07 7401 - Water and Steam for Thermal Energy Devices with Operating Excess Pressure up to 8Mpa
ČSN EN 13 501-1+A1 – Classification of construction products and structures
Part 1: Classification in accordance with the Fire Reaction Tests.
ČSN 73 0831 - Fire Safety of Constructions. Gathering Areas.
ČSN 73 4201 - Chimneys and Flues. Designing, Implementing and Connecting Fuel Appliances.
ČSN 73 4210 - Implementation of Chimneys and Flues and Connecting Fuel Appliances
ČSN EN 303-5 – Solid Fuel Boilers for Central Heating
163/2002 Coll. - Government Directive
26/2003 Coll.
- Government Directive
185/2001 Coll. - Act on Waste
477/2001 Coll. - Act on Packaging
34/1996 Coll.
- Act on Protecting Consumers

25. WASTE DISPOSAL

Packaging materials (paper and wood) can be burned in the boiler. PP tape, unburned remains and ash shall be managed as
communal waste.
When the lifespan of the boiler expires, liquidate its body and grates as metal waste. Insulation material shall be taken to an
appropriate collection location.
The wooden laths are designed for one-time use and cannot be reused as such. Their removal is governed by Act No. 185/2001
Coll., on Waste and on changes of some other Acts, as amended. Used packaging material complies with the requirements for
packages specified by Act No. 477/2001 Sb., on Packages and on changes of some other Acts, as amended.

26. WARRANTY CONDITIONS

1.
H4eko boilers can be installed only by a company with a valid authorization to perform its installation and maintenance.
2.
Installation project must be elaborated in accordance with applicable regulations.
3.
The heating system must be filled with water, which meets the requirements of ČSN 07 7401 and especially its hardness
must not exceed the required parameters. Using antifreeze fluids is not recommended by the manufacturer.
4.
Connecting the boiler to the system must be done in accordance with applicable regulations and standards.
5.
The flue gas path must be checked by chimney-sweeper before commissioning of the boiler. Require an audit report
covering the basic parameters of the flue gas path, including the diameter of the chimney, its length and chimney draft.
29
User manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

H4 eko-d seriesH416 eko-dH420 eko-dH425 eko-d

Table of Contents