24. REGULATIONS AND STANDARDS

ČSN 06 0310 – Central heating. Design and assembly.
ČSN 06 0830 – Safety devices for central heating and service water heating
ČSN 06 1008 – Fire safety of local appliances and heat sources (heaters up to 50 kW)
ČSN 06 1610 – Flue parts of home appliances.
ČSN 07 0245 – How water and low-pressure steam boilers. Hot water boilers up to 50 kW.
Technical requirements:
ČSN 07 7401 – Water and steam for thermal energy devices with operating excess pressure up to 8Mpa
ČSN EN 13 501-1+A1 – Classification of construction products and structures.
Part 1: Classification in accordance with the fire reaction tests.
ČSN 73 0831 – Fire safety of constructions. Gathering areas.
ČSN 73 4201 – Chimneys and flues. Design, implementation and connection of fuel appliances.
ČSN 73 4210 – Implementation of chimneys and flues and connection of fuel appliances
ČSN EN 303-5 – Solid fuel boilers for central heating
163/2002 Coll. – Government Decree
26/2003 Coll. – Government Decree
185/2001 Coll. – Waste Act
477/2001 Coll. – Packaging Act
34/1996 Coll. – Consumer Protection Act

25. WASTE DISPOSAL

Packaging materials (paper and wood) can be burned in the boiler. PP tape, unburned remains and ash shall be disposed of as
communal waste. At the end of the boiler's life, dispose of its body and grates as metal waste. Insulation material shall be taken
to an appropriate collection point.
Wooden laths are designed for one-time use and cannot be reused as such. Their removal is governed by Act No 185/2001 Coll.,
on waste and amending certain other acts, as amended. Used packaging material complies with the requirements for packages
specified by Act No 477/2001 Coll., on packages and amending certain other acts, as amended.

26. WARRANTY TERMS AND CONDITIONS

The following points must be met not only in order to meet the warranty terms and conditions, but also to ensure correct
installation in terms of applicable standards, safety and ensuring the boiler's smooth operation.
1.
The OPOP boilers may only be installed by a company with a valid authorisation to carry out such installation and
maintenance. An installation project must be prepared according to the valid regulations.
2.
The heating system must be filled with water that meets the requirements of ČSN 07 7401 and especially its hardness
must not exceed the required parameters. The use of antifreeze mixtures is not recommended by the manufacturer.
3.
Connecting the boiler to the system must be done in accordance with applicable regulations and standards.
4.
The boiler must be connected to the chimney vent according to ČSN 73 4201:1989.
5.
The flue gas path must be checked by a chimney sweep before installing the boiler. Require an inspection report covering
the basic parameters of the flue gas path, including the chimney diameter, its length and chimney draft.