Summary of Contents for Travis Industries Pro Builder Linear
Page 1
Pro Builder Linear Fireplace (MV & GSB2) Cheat Sheet The Pro Builder Linear has several new characteristics that require special attention during installation. Refer to the manual for full details. The Screen and Decorative Trim are One Assembly and Come With The Fireplace.
Page 2
Pro Builder Linear Fireplace (MV & GSB2) Cheat Sheet Standoffs and Header / Pipe Shield Must be Assembled The header standoffs and both heat shields MUST be used for every installation. Construct the header standoffs on the top of the fireplace (see picture below to the left – see manual for details). Attach the header shield to the standoffs (see picture below to the right).