Commissioning; Operation And Maintenance - WELLSYSTEM MEDWAVE TOUCH Operating Instructions Manual

Dry water massage device
Hide thumbs Also See for MEDWAVE TOUCH:
Table of Contents

Advertisement

Safety instructions and warnings
16/82
1.5.5

Commissioning

Initial commissioning will be undertaken by the manufacturer's own service
personnel or by an authorized service company. The device will be handed
over ready for use.
If the device has not been used for a longer period of time then it must first be
inspected by our customer service staff or by another authorized company
before being put back into operation again.
The device is only to be used if it is working correctly!
None of the safety devices (e.g. switch) or safety warnings are to be removed
or deactivated as this would impair the safe operation of the device!
The unit may only be put into operation if the well has been filled with the
specified amount of water.
The unit may not be connected to the power supply during filling!
The unit may no longer be moved once the well has been filled!
A water cooling system must be connected to the device if it is to be used for
more than 1 hour per day at maximum pressure. The pressure hoses must
not be removed. Please contact the customer service department without fail
before putting the device into operation - see page 2.
The device may only be operated with the pressure hose included in the
scope of delivery.
A water shut-off valve must be used.
A free outlet must be provided; in doing so, a minimum distance must be
maintained that must be larger than twice the inner diameter of the supply
tube. Most effectively, the free outlet (air bridge) prevents the backflow into
the public water supply mains.
High frequency mobile communication systems can interfere with the way the
device functions.
Heat therapy devices (microwave therapy devices, etc.) installed in the vicinity
may lead to electromagnetic interference. Contact our customer service de-
partment if this happens – see page 2.
The device must be connected to the mains via an all pole master switch.
One power supply circuit (power supply lead) may only power one device.
Venting
The tank must be vented 3 days after commissioning or after it has been
initially filled – see page 67. After this, venting is unnecessary unless leak-
ages occur and the tank has to be topped up.
The device may no longer be used in the event of water loss (puddles on the
floor). Please inform our customer service department – see page 2.
1.5.6

Operation and maintenance

Error-free operation, maintenance and service are required in order to ensure
that the health and safety of the patients is not endangered during operation
and to ensure that the device is in a fault-free operating condition.
Always abide by the information and recommendations given in this operating
manual. Ensure that the intervals for the inspection, maintenance and service
are complied with. The maintenance work must be carried out by the custom-
er services of the manufacturer or by qualified specialist personnel authorized
by the manufacturer following a check list.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wave touch

Table of Contents