Commissioning; Operation And Maintenance - WELLSYSTEM Medical_Plus Operating Instructions Manual

Dry water massage bed
Hide thumbs Also See for Medical_Plus:
Table of Contents

Advertisement

Available languages

Available languages

02/2012
1009909-02
2.7

Commissioning

Initial commissioning will be undertaken by the manufacturer's own service
personnel or by an authorized service company. The device will be handed
over ready for use.
If the device has not been used for a longer period of time then it must first be
inspected by our customer service staff or by another authorized company
before being put back into operation again.
The device is only to be used if it is working correctly!
None of the safety devices (e.g. switch) or safety warnings are to be removed
or deactivated as this would impair the safe operation of the device!
The device must never be used if it is empty.
A water cooling system must be connected to the device if it is to be used for
more than 1 hour per day at maximum pressure. The high pressure hoses
must not be removed. Please contact the customer service department with-
out fail before putting the device into operation – see page 2.
The device may only be operated with the high-pressure hoses included in
the scope of delivery.
A water shut-off valve must be used.
High frequency mobile communication systems can interfere with the way the
device functions.
Heat therapy devices (microwave therapy devices, etc.) installed in the vicinity
may lead to electromagnetic interference. Contact our customer service de-
partment if this happens – see page 2.
The device must be connected to the mains via an all pole master switch.
One power supply circuit (power supply lead) may only power one device.
Venting
The tank must be vented 3 days after commissioning or after it has been
initially filled – see page 42. After this, venting is unnecessary unless leak-
ages occur and the tank has to be topped up.
The device may no longer be used in the event of water loss (puddles on the
floor). Please inform our customer service department – see page 2.
2.8

Operation and maintenance

Error-free operation, maintenance and service are required in order to ensure
that the health and safety of the patients is not endangered during operation
and to ensure that the device is in a fault-free operating condition.
Always abide by the information and recommendations given in this operating
manual. Please ensure that the intervals for the inspection, maintenance and
service are complied with. Maintenance work must be carried out in accor-
dance with the checklist supplied by our customer service department. In-
spection work that has been carried out correctly can be entered and con-
firmed on 'Sheet D Maintenance measures / Service' in the Book of Medical
Devices, see page 56.
Unauthorized modifications and changes to the device and its control unit are
prohibited. Failure to comply with this voids the operating licence!
Information for the operator
Operating instructions – 11/60

Advertisement

Chapters

Table of Contents
loading

Table of Contents