Tec Cable Preparation - Ace Reliance 1K Operation Manual

Table of Contents

Advertisement

ACE RELIANCE SENSOR OPERATIONS MANUAL
Figure 11. Tube cutter

4.TEC cable preparation

4.1 Use ACE Dual Seal cable strip gauge to measure and mark the cut-off length (fig 12)
Figure 12. Measuring and marking the TEC tube cut-off length
4.2 Use tube cutter to make a groove in the tube (fig 13)
V2.4
9 |
P a g e

Advertisement

Table of Contents
loading

This manual is also suitable for:

Reliance 10kReliance 10k ht

Table of Contents