ACE RELIANCE SENSOR OPERATIONS MANUAL
Figure 11. Tube cutter
4.TEC cable preparation
4.1 Use ACE Dual Seal cable strip gauge to measure and mark the cut-off length (fig 12)
Figure 12. Measuring and marking the TEC tube cut-off length
4.2 Use tube cutter to make a groove in the tube (fig 13)
V2.4
9 |
P a g e