Kpsi Sensor Model Installation - Ace Reliance 1K Operation Manual

Table of Contents

Advertisement

ACE RELIANCE SENSOR OPERATIONS MANUAL
4.7 Use the dual seal ¼" strip gauge to doublecheck the dimensions of the terminated end of the TEC cable
Figure 19. Dual Seal ¼" strip gauge

5. 10 kPSI Sensor Model Installation

5.1 Unscrew the cover from the head of the sensor
The top
Figure 20
cover
Figure 21. The top cover is unscrewed
5.2 Remove the nuts from the cover and from the top of the sensors
Figure 22. The nuts are unscrewed
V2.4
13 |
P a g e

Advertisement

Table of Contents
loading

This manual is also suitable for:

Reliance 10kReliance 10k ht

Table of Contents