Bunn System III Operating & Service Manual page 17

Bunn coffeemaker operating & service manual
Hide thumbs Also See for System III:
Table of Contents

Advertisement

SERVICE (cont.)
BREW SELECTOR SWITCH (cont.)
7. Install the knob so that the arrow lines up in the 2
gallon position when the switch is turned to the full
right position.
WHI/VIO to By-Pass Valve
WHI/RED to Dispense Valve
GRY to GRY Lead on Interface
Socket
PNK to PNK Lead on Interface
Socket
TAN to TAN Lead on Interface
Socket
WHI/VIO to By-Pass Valve
WHI/RED to Dispense Valve
GRY to GRY Lead on Interface
Socket
PNK to PNK Lead on Interface
Socket
TAN to TAN Lead on Interface
Socket
ELECTRO/MECHANICAL
DIGITAL CONTROL (DBC)
FIG. 5 BREW SELECTOR SWITCH TERMINALS
Page 17
8. Reattach the connector to the brew timer circuit
board or DBC
9. Refer to Fig. 5 when reconnecting the wires.
To Timer (Electro/mechanical Models)
TAN
GRY
PNK
To DBC Board (Digital Brewer Controlled Models)
PNK
TAN
GRY
P1105.75
P1112.75
27362 092996

Advertisement

Table of Contents
loading

Table of Contents

Save PDF