Unloading The Sprayer From The Truck; Parking Stand For Front Tank (Optional Equipment); Before Putting The Sprayer Into Operation - Hardi MARRO TWIN FORCE 1000 Instruction Book

Table of Contents

Advertisement

Unloading the spra a a a a y y y y y er fr
Unloading the spr
Unloading the spr
Unloading the spr
Unloading the spr
For the unloading of the sprayer, you need a crane or a
fork lift.
When loading with a crane please observe the lifting
points as shown on the sketches, and make sure that
the straps or belts used for lifting are strong enough.
MARRO
Front tank
er from the tr
er fr
er fr
om the tr
om the truc
om the tr
uck k k k k
uc
uc
er fr
om the tr
uc
T021-0016x
T021-0004x
P P P P P ar
ar ar
ar ark k k k k ing stand f
ing stand f
ing stand f
ing stand for fr
ing stand f
equipment)
equipment)
equipment)
equipment)
equipment)
A stand for parking the front tank when not used is
available (ref. no. 833269).
Bef
Bef
Bef
Bef
Befor
or or
or ore putting the spr
e putting the spr
e putting the spr
e putting the spr
e putting the spra a a a a y y y y y er into
oper
oper
opera a a a a tion
tion
tion
tion
oper
oper
tion
Although the sprayer has been applied with a strong and
protective surface treatment on steel parts, bolts etc. in
the factories, it is recommended to apply a film of
anticorrosion oil (e.g. CASTROL RUSTILLO or SHELL
ENSIS FLUID) on all metal parts in order to avoid
chemicals and fertilisers discoloring the enamel.
If this is done before the sprayer is put into operation for
the first time, it will always be easy to clean the sprayer
and keep the enamel shiny for many years.
This treatment should be carried out every time the
protection film is washed off.
GB 04 01 01
or fr
or fr
ont tank (optional
ont tank (optional
or front tank (optional
or fr
ont tank (optional
ont tank (optional
er into
er into
er into
er into
T021-0004x
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Marro twin force 1300

Table of Contents