Rinnai HD28E Operation & Installation Manual page 23

Commercial manifold pack
Table of Contents

Advertisement

General System Operation
All Valves in Open Position
Controller Set Temperature (°C)
Water Heater Set Temperature (°C)
Return Pumps Controller Set Mode
Water Heater/s Operation – Satisfactory?
Tanks' PTR Valves' Operation – Satisfactory?
Staging System Operation – Satisfactory?
Primary Pump/s Operation – Satisfactory?
Return Pump/s Operation – Satisfactory?
Storage Tank Reached Temperature?
Return Water Temperature?
Overall System Operation – Satisfactory?
Comments
Client to carry out regular preventative maintenance as below:
Inlet Strainer/s; Hot Water Return Strainer & Water Heaters Inlet Strainers: Once every week for the
first month & three monthly from there onwards
For other details refer to Operation & Maintenance Manual
For effective operation of the system; service the package once every six (6) months as per the
manufacturer's instructions.
In compliance to AS/NZS 5601.1 figure 6.2 minimum clearance required for any air intake from the
exhaust of a water heater is 1500mm.
In compliance to AS/NZS 3500.2 section 6.8.4 termination clause (e), vents shall terminate in the
open air and in a location not less than 5.0m in any direction from any air duct intake.
Warranty:
https://www.rinnai.com.au/wp-content/uploads/2018/02/15401043-V6-Commercial-Warranty-Booklet.pdf
Installation of system to comply within Rinnai installation guidelines and relevant codes
Drainage: Provide appropriately designed drainage system in compliance to applicable building codes
and regulations to prevent property and equipment damage.
Customer Representative
Rinnai
Yes / No
Yes / No
Yes / No
Yes / No / NA
Yes / No / NA
Yes / No / NA
Yes / No / NA
Yes / No
Date
23
COMMISSIONING
Commercial Manifold Pack OIM