INSTALLATION INSTRUCTIONS
Starting instructions
These are specific to the Manifold Pack and installation configuration:
MANIFOLD PACK WITH NO RETICULATION SYSTEM
•
Turn on power to each heater via the Socket Outlets
•
Open one or more outlets to generate water flow through the heaters. The outlet temperature should appear
in the maintenance monitor window on each heater. This is factory preset at 75°C but can be adjusted if
required, refer to relevant temperature settings for heaters. This indicates the units are operational.
•
Not all heaters may will fire up as this is flow rate dependent. To verify all heaters are operational either open
more outlets or, if this is not practical, close the cold water valve underneath the currently operating heaters
to restrict the flow. Other heaters should then fire up.
•
Clean all filters on completion
MANIFOLD PACK WITH RETICULATION SYSTEM
•
Turn on power to each heater via the Socket Outlets
•
Turn on the Ring Main pump to generate water flow through the heaters. The outlet temperature should
appear in the maintenance monitor window on each heater. This is factory preset at 75°C but can be adjusted
if required, refer to relevant temperature settings for heaters. This indicates the units are operational.
•
Not all heaters may fire up as its flow rate dependent. To verify all heaters are operational either open some
outlets or, if this is not practical, close the cold water valve underneath the currently operating heaters to
restrict the flow. Other heaters should then fire up.
•
Clean all filters on completion