Izon EXOID Quick Start Manual
Hide thumbs Also See for EXOID:

Advertisement

GETTING STARTED WITH
WELCOME TO THE IZON FAMILY
Before you can get started on unpacking and installing your exciting
new system, there are a few important things to cover:
If you require an IQ/OQ (also known as 3Q) installation, please remove the
Solution S and TKP200 particles from the Training Kit and store them at
4-8°C. Close the box and set it aside for when your certified Izon Science IQ/
OQ executor is present.
If you do not require an IQ/OQ installation you can unpack and set up the rest
of your system according to the instructions in the Exoid User Manual.
SURE TO PAY CLOSE ATTENTION TO THE INSTRUCTIONS ON THE OTHER
SIDE OF THIS PAGE WHEN PLUGGING IN THE INSTRUMENT!!
The Exoid User Manual (for non-IQ/OQ installations) can be found by going to
https://cdn.brandfolder.io/ZPO3JAFV/at/7nsx5grn5zqq4kxpsfp8pb5/Exoid_
Manual_B.pdf
The User Manual has detailed instrument descriptions and installation
information which you will need to read through in its entirety before
operating the equipment.
For extra support, proceed to
www.izon.com
YOUR EXOID
support.izon.com
MAKE

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EXOID and is the answer not in the manual?

Questions and answers

Summary of Contents for Izon EXOID

  • Page 1 If you require an IQ/OQ (also known as 3Q) installation, please remove the Solution S and TKP200 particles from the Training Kit and store them at 4-8°C. Close the box and set it aside for when your certified Izon Science IQ/ OQ executor is present.
  • Page 2 USB cable removed. Failure to turn the switch off may result in Exoid malfunction, while failure to remove the usb cable will result in an inability for the Exoid to communicate with the software correctly.

Table of Contents