3.2 Working space (required space around the product)
This product requires regular maintenance (filter cleaning, parts replacement). Place the product from any other
obstacles for maintenance.
■VL-250CZPVU-R
60
Space to pull out
■VL-250CZPVU-L
46
Space to pull out
Note
- Secure about 2 mm of clearance from the side faces of the product to any other obstacles. (If not enough clearance
is secured, maintenance cannot be performed. Plus, vibration can result.)
- Secure space below the product for withdrawing the control box.) (If not enough space is secured, maintenance
cannot be performed.)
500≤
500≤
Eng-11
600≤
Control box
298
600≤
Control box
298
Unit (mm)
Unit (mm)