Installation Procedure; Equipment List; Mounting Instructions; Connections - Airstream ITA-6 User Manual

Table of Contents

Advertisement

INSTALLATION PROCEDURE

Equipment List

Integrating an air inlet control system into your ventilation system requires
the following equipment:
• A Comlink-2 communication module added to your controller
• A ITA-6 controller for each air inlet panel (up to 100 in all)
• An alarm system (optional)
• A DC power supply (optional)
• A power unit.

Mounting Instructions

Remove the four screws on the front cover and lift the cover. Mount the
enclosure on the wall using three screws. Be sure the electrical knockouts
are at the bottom of the enclosure in order to prevent water from entering
the controller. Insert the screws in the mounting holes provided in three
corners of the enclosure and tighten. Fasten the three black caps provided
with the controller onto the three mounting holes.

Connections

To connect the equipment, refer to the wiring diagrams enclosed with this
user's manual. Also refer to the DC power supply wiring diagram when
using a DC type motor.
Use the electrical knockouts provided at the bottom of the enclo-
sure. Do not make additional holes in the enclosure.
Set the voltage switch to the appropriate line voltage.
ITA-6 rev.02
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents