WACO YMF F5 Series Maintenance Manual page 40

Table of Contents

Advertisement

YMF WACO F5/F5C SCHEDULED MAINTENANCE WORKSHEET
D. FUSELAGE and EMPENNAGE
1 Remove inspection covers and fairings
Inspect fabric for holes or deterioration ( See Note 9 and FAA AC
2
43.13-1B)
Inspect front (if installed) and rear baggage compartment doors and
3
proper stowage of equipment
4 Inspect electronic installations for security
5 Inspect antennae mounts and wiring for security
Inspect rudder, elevator and stabilizer trim cables, turnbuckles,
6
fairleads, pulleys and attachments for safety devises, condition and
proper operation
7 Inspect fuselage structure for damage or corrosion
Inspect fin and rudder structure and hinges for condition and
8
security
Inspect stabilizer and elevator structure, hinges (see Note 6) and
9
mounting for condition and security
10 Check external brace wires for corrosion, correct tension and safety
11 Check stabilizer trim screw for end play, security and proper lubrication
Check for correct rudder and elevator travels and proper elevator
12
cable tension (see WACO Classic Maintenance Manual YMFAMM-1
page 20 paragraph 6.3 for detailed instructions)
Lubricate elevator hinge bearings in accordance with WACO YMF-5
13
lubrication chart
If Glider/Banner Tow Hitch system is installd, inspect in accordance
14
with K&L Soaring Form F-236 (See Sec. 10 of YMFAMM-1)
Vacuum interior and inspect all areas under and behind seats for
15
tools, rags and other loose equipment
Inspect internal structure of fuselage, bulkheads and tail section.
16
(see Note 9)
17 Re-install inspection covers and fairings
REV: F
RELEASED: 21 Jul 2017
TASK DESCRIPTION
PAGE 6 OF 12
M
1
A
E
5
0
N
C
0
0
N
H
U
A
H
H
A
N
R
R
L
I
C
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
WCAC FORM
I
N
S
P
E
C
T
O
R
SMWS

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ymf f5aYmf f5bYmf f5c

Table of Contents