7.
Attach the tamper label (included with the CMS-5000) across the edge of the CMS-5000 and the chassis of the projector such that the
CMS-5000 cannot be removed without the label being affected. The label provides security detection if the CMS-5000 is removed.
8.
Reinstall the projector panels according to the manufacturer's instructions.
9.
If the projector's Ethernet cable was disconnected in step 3, reconnect it now.
10. Connect the AES/EBU audio cables to the audio ports. Refer to Figure 1 for the location of the ports and Table 3 on page 10 for
pinout information. For optimum performance, use Cat 6a cables to provide the connection to QSC audio processors like the DPM
100(H), DPM 300(H), JSD-100 or JSD-60.
11. Optional – If the system requires a control network or Ethernet automation devices, install the Control network cable into the ETH
A or ETH B port on the front of the CMS-5000. Refer to Figure 1 for the location of the ports.
12. For systems that have a Data network, typically used for transferring content between systems, install the data network Ethernet
cable into ETH A, ETH B or the HS ETH port on the CMS-5000. Refer to Figure 1 for the location of these ports. For the HS ETH port
an SFP+ module is required. See section Network and FTP Server Settings for recommended SFP+ module specifications.
13. If the CMS-5000 is being used with a Q-SYS core, install the Q-LAN™ network cables into the LAN A and LAN B ports (LAN B
connection only required when using network redundancy).

Power-up

The CMS-5000 will begin to boot as soon as the projector is powered on. This will take several minutes. The chart below describes
the various modes of the CMS as indicated by the front panel LEDs. Additional information on LED modes can be found in the
Troubleshooting Guide.
CMS-5000 Mode
Unpowered
Initialization
Power On Self-test
Awaiting Projector Marriage
Normal Operation
Service Door Open
Recoverable Error
Tampered (Return to factory)

Projector Marriage with CMS-5000

Projector marriage with the CMS is performed automatically once the marriage is initiated from the Projector. Prior to marriage, the RDY
led will flash and you will not be able to log in to the CMS UI. Once marriage is complete, the RDY led will be ON.
 
NOTE:
NOTE:
You cannot log into the CMS UI until marriage is complete. You can still access the logs by opening the online help (click
on Help icon on upper right).

Barco

Initiate marriage as instructed by the projector instructions.

NEC

Initiate marriage as instructed by the projector instructions.

Christie

Initiate marriage as instructed by the projector instructions. In the IMB type field, select QSC, or Dolby IMB on older firmware versions.
TD-001576-01-A
— Table 1 —
TAMPER
FLT
RED
YEL
OFF
OFF
ON
ON
OFF
FLASH
OFF
OFF
OFF
OFF
FLASH
OFF
OFF
ON
ON
OFF
4
PWR
RDY
GRN
GRN
OFF
OFF
ON
ON
ON
FLASH
ON
FLASH
ON
ON
ON
OFF
ON
OFF
ON
OFF

Advertisement

Table of Contents
loading

Table of Contents