rollease acmeda Automate Instruction Manual

rollease acmeda Automate Instruction Manual

Hide thumbs Also See for Automate:

Advertisement

INSTRUCTION MANUAL
Rechargeable Battery Pack
SOLAR OPTION
USB CHARGE
The rechargeable Lithium-Ion battery pack enables Automate D/C motors to operate
wirelessly and without the constraints of traditional battery wands with disposable
batteries.

FEATURES:

Replacement for Traditional Battery Wands that use disposable batteries
Provides up to 500 up/down cycles on a single charge
(depends on shade size & fabric weight)
Compatible with Automate Cord Lift, Venetian Tilt, 25 & 28mm tubular DC motors
Small profile allows for optimal placement in window pocket
Battery pack fully recharges in ~ 7 hours
Battery health status reported in Automate Pulse App
Pairs with optional solar panel for autonomous re-charging
AUTOMATE | Rechargeable Battery Instructions_MT03-0305-069003_IM_v1.0

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Automate and is the answer not in the manual?

Questions and answers

DONALD WEINGART
April 30, 2025

IS THE CHARGER WORKING IF THE LIGHT WHEN PLUGGED IN ALWAYS GREEN

Summary of Contents for rollease acmeda Automate

  • Page 1 Provides up to 500 up/down cycles on a single charge (depends on shade size & fabric weight) • Compatible with Automate Cord Lift, Venetian Tilt, 25 & 28mm tubular DC motors • Small profile allows for optimal placement in window pocket •...
  • Page 2 However, there is no guarantee that interference will not occur in a particular installation. Do not dispose of in general waste. Please recycle batteries and damaged electrical products appropriately. 2 | Automate ROLLEASE ACMEDA Rechargeable Battery Instructions | MT03-0305-069003 ™...
  • Page 3 IMPORTANT Rechargeable Battery Pack must be fully charged prior to first use to prolong battery lifespan. Step 1. Connect the Rechargeable Battery Pack to the Rollease Acmeda charger. MT03-0301-069008 +MT03-0301-069007 Step 2. Charge for 6 hours. Step 3. Install as required.
  • Page 4 Motor Connection Cable MTDCRF-TILT-1 MTDCRF25-1.1 MTDCRFQ28-2 Cord Lift MTDCRF-CL-0.6-50 ROLLEASE ACMEDA | USA ROLLEASE ACMEDA | AUSTRALIA ROLLEASE ACMEDA | EUROPE Level 7 / 750 East Main Street 110 Northcorp Boulevard, Via Conca Del Naviglio 18, Stamford, CT 06902, USA...

Table of Contents