Installation instructions, only for experts
Connection of Qube 12 kW and 15 kW
(QUBE-120 / QUBE-150)
1. Guide the connection cable for the sauna control unit through the feed-
through 6.
2. Connect the connectors of this connection cable to the U1 – V1 – W1 – N – PE
terminals on the connector block 7 and to the applicable sauna control unit
terminals. Observe the installation instructions for the sauna control unit when
doing so.
3. Guide the booster cable through the feed-through 5.
4. Connect the connectors of the booster cable to the U2 – V2 – W2 – N – PE
terminals on the connector block 4 and to the applicable booster terminals.
Observe the installation instructions of the booster when doing so.
5. Reattach the cover panel 1 to the heater.
7
6
4 Connector block for the booster
5 Feed-through for the booster cable
6 Feed-through for the connection cable for the sauna control unit
7 Connector block for the sauna control unit
U1
V1
W1
N
PE