Running-In Instructions; General; After 25 Operating Hours - Fayat Group BOMAG BT 65 Operating Instruction, Maintenance Instruction

Table of Contents

Advertisement

Maintenance – Running-in instructions

8.4 Running-in instructions

8.4.1 General

8.4.2 After 25 operating hours

68
The following maintenance work must be performed when running
in new machines or overhauled engines:
NOTICE!
Danger of engine damage!
Up to approx. 250 operating hours check the
engine oil level twice every day.
Depending on the load the engine is subjected to, the
oil consumption will drop to the normal level after
approx. 100 to 250 operating hours.
1.
Change the engine oil
oil' on page 70.
2.
Check the idle speed and the max. speed of the engine,
adjust if necessary
engine speed' on page 84.
3.
Check engine and machine for leaks.
4.
Retighten the fastening screws on air filter, exhaust and other
attachments.
5.
Retighten the bolted connections on the machine.
BT 65
Ä Chapter 8.6.1 'Changing the engine
Ä Chapter 8.7.4 'Checking, adjusting the

Advertisement

Table of Contents
loading

Table of Contents