Download Print this page

WE-EF ETC130-FS LED Installation And Maintenance Instructions Manual

Inground luminaire

Advertisement

Quick Links

Do not open during installation
This product is factory-sealed.
Refer to the instructions contained in this
document for details.
Surge Protection
This product features built-in surge protection circuitry in compliance with
applicable standards.
For comprehensive protection of a luminaire installation against lightning and
electrical surges, it is essential to cover mains supply and data input lines at
the distribution board level, by using respective primary (Type 1) and secondary
(Type 2) surge arrestors in compliance with EN61643-11/IEC61643-1.
Warning
Ensure that all required surge protection measures are in place and activated
prior to luminaire installation. Also, disconnect luminaires before operating
high-power devices such as, for example, electrical arc welders.
WE-EF LEUCHTEN
Installation and Maintenance
Instructions
Inground Luminaire
ETC130-FS LED
EVC130-FS LED
ETC140-FS LED
EVC140-FS LED

Advertisement

loading

Summary of Contents for WE-EF ETC130-FS LED

  • Page 1 WE-EF LEUCHTEN Installation and Maintenance Instructions Inground Luminaire ETC130-FS LED EVC130-FS LED ETC140-FS LED EVC140-FS LED Do not open during installation Surge Protection This product is factory-sealed. This product features built-in surge protection circuitry in compliance with Refer to the instructions contained in this applicable standards.
  • Page 2 Inground Luminaire ETC130-FS EVC130-FS ETC140-FS EVC140-FS IP67, Class I, ta = 40°C...
  • Page 3: Maintenance

    Light Source Maintenance Apart from cleaning the product’s exterior surfaces, no special maintenance work is required. Do not use high-pressure cleaners. In case of component failure due to abnormal circumstances or at end of life, replacement must be carried out by a suitably quali ed and trained professional.
  • Page 4: Installation Methods

    Installation Installation Methods The product must be installed and maintained by a For proper installation, use the supplied installation suitably quali ed professional in compliance with latest blockout. building/construction and/or electrical regulations and relevant legislation. Ensure that proper drainage is provided for the shown installation methods: Warning: Switch off mains electrical supply prior to In landscape areas, sand with gravel base (Fig.
  • Page 5 Phase One Phase Two Blockout Installation Procedure Luminaire Installation and Electrical Connection (during earth or masonry work) 4) Switch off mains electrical supply. 1) Ensure a suitable recess is provided to accommo- 5) Check that rating shown on luminaire label conforms date installation blockout/mounting ring assembly with mains electrical supply.
  • Page 6 Fig. III...
  • Page 7 TH0717W DIRECT LUMINAIRE TOWARDS WALL Remove label before operation of luminaire. Fig. IV Fig. V...
  • Page 8 Tel +1 724 742 0030 Fax +41 22 752 49 74 Fax +1 724 742 0035 info.switzerland@we-ef.com info.usa@we-ef.com WE-EF LIGHTING United Kingdom Tel +44 844 880 5346 Fax +44 844 880 5347 info.uk@we-ef.com TO9125W0918 © WE-EF 2018 Technical speci cations are subject to change.

This manual is also suitable for:

Evc130-fs ledEtc140-fs ledEvc140-fs led