Page 1
WE-EF LEUCHTEN Installation and Maintenance Instructions Inground Luminaire ETC330-GB LED ETC340-GB LED INSTALLER HOTLINE +61 458 933 399 7am – 7pm AEST...
Page 3
Maintenance Warning: Do not open luminaire while mains supply is switched on. Apart from cleaning the outside of the luminaire, no special maintenance is necessary. Damaged mains supply cable: Contact your authorised WE-EF agent for replacement. Inground Luminaire ETC330-GB ETC340-GB...
Page 4
Fig. I Minimum Distance ETC330-GB: No minimum distance. ETC340-GB: Ensure the minimum distance for objects to be illuminated is correct (see illustration - - - - - - inside luminaire).
Page 5
Phase One Phase Two Blockout Installation Procedure Luminaire Installation, Electrical Connection, and (during earth or masonry work) Aiming Procedure 1) Ensure a suitable recess is provided to accommo- 5) Switch off mains electrical supply. date installation blockout/mounting ring assembly 6) Check that rating shown on luminaire label con- B/M.
Page 6
13) Insert screw driver into a slot on locking wheel W. Rotate locking wheel W in the 'LOCK' direction until the gimbal is fi rmly secured (Fig. IV). Warning: Do not tighten more than necessary to secure gimbal. 14) Ensure that all surfaces are clean and dry. Reposition lens/gasket assembly Q, cover P and screws C on luminaire housing A.
NOTE: LED luminaires are static sensitive devices; please ensure that appropriate ESD measures are taken before opening luminaire. If in doubt, please contact WE-EF. The desiccant sachet MUST not be left in the open environment. please seal luminaire down within 15 minutes of opening sachet.
Need help?
Do you have a question about the ETC330-GB and is the answer not in the manual?
Questions and answers