SMA SUNNY CENTRAL CP XT Series Installation Manual page 25

Retrofitting of the option "noise reduction"
Table of Contents

Advertisement

SMA Solar Technology AG
Minimum clearances for two inverters with mv transformer to be installed outdoors
Option 1
Figure 8: Minimum clearance for two inverters with MV transformer
Position
Designation
A
Inverter 1
B
Inverter 2
C
MV transformer and MV switchgear
D
Cable route between inverter and MV switchgear
Installation Manual
8 Dimensions and minimum clearances
SCCPXT-SCS_NR-IA-en-12
25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents