Installing The Cable-Management Arm - IBM S812L Installing

Table of Contents

Advertisement

7. While you pull the slide rail forward, ensure that all three pins protrude through the rack holes, then
push the front latch (2) all the way in. For details, see Figure 23.
Figure 23. Latch seated on the front rail of the rack
Note: If you must reposition the rail, release the front latch (2), and while you press the blue pin at
the bottom, push the rail up and toward the rear to release from the rack.
8. Repeat these steps to install the right rail into the rack.

Installing the cable-management arm

The cable-management arm is used to efficiently route cables so that you have proper access to the rear
of the system. Use the procedure to install the cable-management arm.
To install the cable-management arm, complete the following steps:
1. Ensure that you have the following parts.
Item Description
A
Support arm
B
Cable-management stop bracket
C
Mounting bracket
D
Cable-management arm
E
Extension bracket
Installing the IBM Power System S812L (8247-21L)
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

8247-21l

Table of Contents