Cabling The Server And Accessing The Ivm - IBM S812L Installing

Table of Contents

Advertisement

Figure 35. Attaching the HMC to the managed system
2. To learn how to connect an HMC to a private network so that it can manage more than one managed
system, see HMC network connections (http://www.ibm.com/support/knowledgecenter/POWER8/
p8hai/netconhmc.htm).
Notes:
v You can also have multiple systems that are attached to a switch that is then connected to the
HMC. For instructions, see HMC network connections (http://www.ibm.com/support/
knowledgecenter/POWER8/p8hai/netconhmc.htm).
v If you are using a switch, ensure that the speed in the switch is set to Autodetection. If the server
is directly attached to the HMC, ensure the Ethernet adapter speed on the HMC is set to
Autodetection. For information about how to set media speeds, see Setting the media speed
(http://www.ibm.com/support/knowledgecenter/POWER8/p8hai/lanmediaspeed.htm).
3. If you are connecting a second HMC to your managed server, connect it to the Ethernet port that is
labeled HMC2 on the managed server.
4. Continue with "Cabling the server and connecting expansion units" on page 16.

Cabling the server and accessing the IVM:

When you install the Virtual I/O Server (VIOS) in an environment where no Hardware Management
Console (HMC) is present, the VIOS automatically creates a management partition whose interface is the
Integrated Virtualization Manager (IVM).
To prepare for and install the VIOS and to enable the IVM, complete the following steps:
1. Connect a serial cable from a PC or ASCII terminal to a system port on the server.
2. Complete the following steps:
a. Verify that you have access to the Advanced System Management Interface (ASMI) by using the
web interface.
b. Verify that you have administrator or authorized service provider authority in ASMI.
Installing the IBM Power System S812L (8247-21L)
33

Advertisement

Table of Contents
loading

This manual is also suitable for:

8247-21l

Table of Contents