Gage Bilt GB743SRAVT Manual

Gage Bilt GB743SRAVT Manual

Installation tool

Advertisement

Quick Links

GB743SRAVT
INSTALLATION TOOL
GAGE BILT TOOLS ARE AVAILABLE WORLDWIDE
E-MAIL US FOR A DISTRIBUTOR NEAR YOU.
GAGE BILT Inc.
GAGE BILT
44766 Centre Court
(586) 226-1500
Clinton Twp. MI 48038
(586) 226-1505 Fax
MADE IN U.S.A.
e-mail: solutions@gagebilt.com / www.gagebilt.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GB743SRAVT and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Gage Bilt GB743SRAVT

  • Page 1 GB743SRAVT INSTALLATION TOOL GAGE BILT TOOLS ARE AVAILABLE WORLDWIDE E-MAIL US FOR A DISTRIBUTOR NEAR YOU. GAGE BILT Inc. GAGE BILT 44766 Centre Court (586) 226-1500 Clinton Twp. MI 48038 (586) 226-1505 Fax MADE IN U.S.A. e-mail: solutions@gagebilt.com / www.gagebilt.com...
  • Page 2: Specifications

    TABLE OF CONTENTS Description Page Warnings ............................... 3 Description, Operation, Maintenance and Hydraulic Thread Preparation ........4 Parts Lists ............................. 5 Vacuum assembly and Nose chart ....................6-7 Troubleshooting & How to Clean Vacuum Regulator ................ 8 EU Conformity and Warranty ......................9 SPECIFICATIONS Hand Held Weight - 3.50 lbs.
  • Page 3: Safety Warnings

    Any repair should be done by qualified personnel trained on Gage Bilt WARNING procedures. It is recommended tool be operated 50 out of every 60 minutes, where prolonged use is expected.
  • Page 4: Operation

    ASSEMBLY 8N-743-24SRV AND A SPARE NOSE TIP 10204 AND FOLLOWER 703433 TO CONVERT TO A 6N-743-24SRV. ALL OTHER NOSE TIPS MUST BE ORDERED SEPARATELY. WHEN ORDERING TOOL RIVET SPECIFIC, PLEASE CONTACT GAGE BILT FOR MORE INFORMATION. SEE CHARTS ON PAGES 6 & 7 FOR PART NUMBERS. OPERATION...
  • Page 5 GB743SRAVT - PARTS LIST INCLUDES: 704307 HOSE GUARD– NOT SHOWN EVACUTATION TUBING —SOLD SEPARATELY SEE CHART PG 6 & 7 204304 - SWIVEL ASSEMBLY 401080 - BACK-UP RING 403764 - O'RING 3/14...
  • Page 6 3/14...
  • Page 7 3/14...
  • Page 8: Troubleshooting

    TROUBLESHOOTING Providing all maintenance conditions have been met, follow this systematic approach to diagnosis. 1. NO OPERATION WHEN ACTUATOR LEVER ASSEMBLY IS DEPRESSED a.) Check powerunit power source. b.) Faulty actuator assembly. Replace. c.) Check hydraulic couplings; tighten, repair or replace. 2.
  • Page 9: Declaration Of Conformity

    WE DECLARE THAT THE EQUIPMENT SPECIFIED HEREIN CONFORMS TO THE FOLLOWING STANDARDS AND DIRECTIVES. EN12100-1 & EN12100-2 EN13849 EN792-1:2000+A1 COUNCIL DIRECTIVE: MACHINE DIRECTIVE 2006/42/EC EQUIPMENT DESCRIPTION: GB743SRAVT FASTENER INSTALLATION TOOLS MANUFACTURER: GAGE BILT Inc. SIGNATURE: NAME: BRIAN LEIGH PRODUCT MANAGER CLINTON TWP., MI U.S.A.

Table of Contents