Mira Element Thermostatic Mixer Installation And User Manual page 18

Table of Contents

Advertisement

2.5 Fit the supply pipework (Hot - Left,
Cold - Right).
note! if the connections are reversed,
complete the installation then refer to
section: 'Reversed Inlet supplies'
before commissioning.
2.6 loosen the Grubscrew with the
2.5 mm hexagon Key (supplied)
and remove the Backplate from the
Mixer.
2.7 secure the Backplate to the wall
using the screws (supplied).
Caution! it is essential at this point
that the supply pipework is thoroughly
flushed through before connection to
the Mixer. Failure to do so may result
in product malfunction.
2.8 Fit the compression nuts and olives
onto the pipework.
2.9 align the Mixer with the pipework and
fit onto the Backplate.
2.10 tighten the compression nuts onto
the Mixer with a suitable spanner.
Caution! take care not to damage
the chrome surfaces.
2.11 tighten the Grubscrew to secure the
Mixer to the Backplate.
2.12 Fit the shower Fittings, refer to your
shower Fittings installation and User
Guide for instructions.
note! For high pressure systems,
a 12 litre/minute Flow regulator
(supplied) can be fitted under the
hose Washer (refer to illustration).
2.13 turn on the hot and cold water
supplies and check for leaks.
2.14 Before using the shower, refer to
section: 'Commissioning'.
Hot
Grubscrew
Flow regulator
(for high pressure
systems)
18
Cold

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents