e. Route the SCSI cable underneath the three cables you disconnected in the previous
f. Arrange the ATX processor power cable, the ATX system board power cable, and the
Figure 2-28: SCSI cable routing for standard height/full-length
controller boards phase 3
g. Route the SCSI and power cables through the cable management opening of the
h. Connect the SCSI and power cables to their corresponding connectors on the rear of
i.
2-24
All manuals and user guides at all-guides.com
step.
2
I
C PSU cable over the routed SCSI cable, then reconnect them to their
corresponding system board connectors.
chassis' partition wall.
the new drive.
Make sure the terminated end of the SCSI cable is positioned in the manner
illustrated Figure 2-29.
Check that all cables are clear of the hard drive carrier and are properly routed to
their corresponding connectors, then tighten the screw that secures the hard drive
assembly to the chassis.