HP ProLiant DL145 Maintenance And Service Manual page 33

Hide thumbs Also See for ProLiant DL145:
Table of Contents

Advertisement

Figure 2-26: SCSI cable routing for standard height/full-length
controller boards phase 1
2. Route the SCSI cable towards the SCSI hard drive:
a. Align the assembly with the system board expansion slots, then press it down to
b. Tighten the two captive thumbscrews to secure the assembly to the chassis.
c. Route the SCSI cable between the IDE data cable and the power supply unit making
Figure 2-27: SCSI cable routing for standard height/full-length
controller boards phase 2
d. Disconnect the following cables from their system board connectors— the 8-pin
HP ProLiant DL145 Generation 2 Server Maintenance and Service Guide
All manuals and user guides at all-guides.com
ensure full connection to the system board.
sure it lays flat between this space.
ATX processor power cable, the 24-pin ATX system board power cable, and the 4-
2
pin I
C PSU cable.
Removal and Replacement Procedures
2-23

Advertisement

Table of Contents
loading

Table of Contents