I.O.M - SUBMERSIBLES - SÉRIES FBV SINCE 1981 1. SERVICE ET GARANTIE Si vous ne pouvez trouver la raison du problème, consultez votre vendeur local ou la compagnie où vous avez fait l’achat de la pompe. La pompe est garantie 1 an à partir de la date d’achat.
I.O.M - SUBMERSIBLES - SÉRIES FBV SINCE 1981 3. RÉSOLUTION DE PROBLÈMES POUR PRÉVENIR DES ACCIDENTS GRAVES, DÉBRANCHER LA SOURCE D’ALIMENTATION AVANT L’INSPECTION DE LA POMPE:...
Page 4
I.O.M - SUBMERSIBLES - SÉRIES FBV SINCE 1981 4. ÉTAPES PRÉ-OPÉRATOIRE 1.1. S’assurer d’avoir une bonne mise à terre, et installer le fusible à fuite pour prévenir les utilisateurs de se faire électrocuter. 1.2. S’assurer que le voltage de la source d’alimentation est identique à celui de l’étiquette de la pompe.
I.O.M - SUBMERSIBLES - CMLU INSTALLATION SINCE 1981 1. Before installation: Use a megger to measure the insulation resistance between the ground wire and each phase of the motor. Keep the ground wire off the ground during measurement The value of each reading should be more than 20 meg-ohms.
I.O.M - SUBMERSIBLES - CMLU INSTALLATION SINCE 1981 2. Installation (continued) d.) Motor protection: • For 3HP motors, a built-in auto-cut is used and will be activated when motor becomes overheated due to abnormal conditions such as locked rotor or single phasing. There is no external wiring for this feature. •...
I.O.M - SUBMERSIBLES - CMLU MAINTENANCE SINCE 1981 Note: Disassembly and repair of the pump should only be performed by factory trained service centers. Errors made by unqualified personnel can result in improper assembly and operation, therefore resulting in possible injury. WARNING Always turn the power OFF before inspecting and repair the pump.
Page 13
I.O.M - SUBMERSIBLES - CMLU SINCE 1981 1. Disassembly: Unscrew and remove the bolts (120-2), and lift the motor out of the pump casing. Lay it down on its side carefully. Unscrew and remove the impeller bolt (275), then pull the impeller (021) off the motor shaft. Unscrew and remove the oil plug (193) and drain oil from seal chamber.
Page 16