Transport / Storage / Installation; Checking The Delivery; Transporting The Pxtfx Active Energy Management Device; Storing The Pxtfx Active Energy Management Device - Koch PxtFX Operating Manual

Active energy management device
Table of Contents

Advertisement

Available languages

Available languages

4
4.1
Scope of delivery

Checking the delivery:

4.2
4.3
T
/ S
RANSPORT
TORAGE
Checking the delivery
The PxtFX active energy management device leaves the factory in a tested and
perfect condition.
There is a packing label on the outside of the packaging.
Any transport damage is the responsibility of the transport company.
• 1 × PxtFX active energy management device
• 1 × ferrite sleeve
• 1 × Operating manual for the PxtFX active energy management device
The exact scope of larger deliveries will be given on the delivery note.
Check the packaging for damage.
Immediately notify the transport company about any damage to the packaging
and/or the device.
The transport company must receive a written damage report within 7 days.

Transporting the PxtFX active energy management device

Transport the PxtFX active energy management device to the installation site in its
original packaging.
Avoid heavy vibrations and hard knocks.

Storing the PxtFX active energy management device

The PxtFX active energy management device must be stored in clean, dry areas.
Any condensation must be excluded.
Temperatures between -10° C and +65° C are permissible.
Any temperature fluctuations must not exceed 30 K per hour.

4 Transport / Storage / Installation

/ I
NSTALLATION
Operating manual PxtFX active energy management device
13
V1.1DE/EN

Advertisement

Chapters

Table of Contents
loading

Related Products for Koch PxtFX

Table of Contents