Download Print this page

Immergas NIKE Star Instruction Booklet And Warning page 104

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 103
air from rooms adjacent to that being ventilated. For more details regarding
ventilation of rooms follow the procedures prescribed by the regulations.
ES
Openings in outer walls of the room being ventilated. These openings
must:
- have a net total section of 6 cm
with a min. of 100 cm
PT
- be carried out in such a way that the openings, both inside and outside
the wall, cannot be blocked;
- be located near floor level, and if this is not possible, the section of the
GR
openings must be increased by 50%.
PL
TR
MIN. INCLINE 3%
CZ
HR
SL
HU
Circulating pump.
RU
Nike Star series boilers are supplied with a built-in circulating pump with 3-
position electric speed control. The boiler does not operate correctly with
the circulating pump on first speed.
To ensure optimal boiler operation, in the case of new systems (single pipe
RO
and modul) use the circulating pump at maximum speed. The circulation
pump is already fitted with a capacitor.
GB
Available head at system (with automatic by-pass).
Kits available on request
• Kit of system shutoff valves (on request). The boiler is fitted for installing
the system shut-off cocks on the delivery and return pipes of the
connection unit. This kit is extremely helpful for maintenance as it permits
draining the boiler alone without having to drain the entire circuit as well.
• Polyphosphate batching kit (on request). The polyphosphate batching
unit prevents the formation of limescale over time and maintains constant
heat exchange conditions and production of domestic hot water. The
boiler is designed for application of the polyphosphate batching unit.
The above kits are supplied complete with instructions for assembly and
102
use.
2
for every kW of installed heating power,
2
;
A
B
Flow rate Litres/h
A =
Head available on third speed
setting
B =
Head available on second
speed setting

Advertisement

loading